Privacy Policy

This site uses cookies to provide you with an optimal experience.  Learn more

Where would you like to share this page?

Town Planning

Permit application — Change of use


Identification of the applicant

Is the applicant the owner of the property concerned by the request?

Identification of the owner

As per the title deed

Owner 1

Authorization

The signature of all owners, as indicated on the evaluation roll for the property in question, is required. One person may be designated, in writing, to represent all the owners for the present request (see section "Identification of the applicant").

If the registered owner is a Company (legal entity) and the designated representative is not the major shareholder, attach a certified copy of the resolution from the Administrative Council authorizing this person to sign the permit application.

For new owners who are not currently registered on the evaluation roll, please attach a copy of your deed of sale.

You may also attach a signed proxy from the owner authorizing the applicant to sign or receive information issued by the Municipality of Bolton-Est on their behalf.

Download the proxy application

Drop files here or click to upload them.

Location of work

Type of property
If applicable

Description of the work

Will any previous use of the building be abandonned?
Will the new use be
Will renovation work be undertaken?
Will there be windows and/or doors to change?
Will there be a change in the size of the windows?
Will design or landscaping work be undertaken?
Will the number of units in the building change
Change in the number of bedrooms
Will a new civic address be necessary?
(If applicable)
Will a sign be installed for this new usage

In that case, make sure to also complete the Sign Permit Application form

Contractor and work schedule

Who will carry out the work?

Documents to submit with your application

Required documents

Drop files here or click to upload them.

Communication

Preferred correspondence method

Consent and signature

The fee for this permit application is $50.

For a change of use of a building or part of a building, plans of the existing structure may be required.

An inspection of the building must be carried out by the Building Inspector before the changes are processed by our evaluators.