This site uses cookies to provide you with an optimal experience. Learn more
To be able to submit the form, please accept functional cookies.
Yes
No
As per the title deed
The signature of all owners, as indicated on the evaluation roll for the property in question, is required. One person may be designated, in writing, to represent all the owners for the present request (see section "Identification of the applicant").
If the registered owner is a Company (legal entity) and the designated representative is not the major shareholder, attach a certified copy of the resolution from the Administrative Council authorizing this person to sign the permit application.
For new owners who are not currently registered on the evaluation roll, please attach a copy of your deed of sale.
You may also attach a signed proxy from the owner authorizing the applicant to sign or receive information issued by the Municipality of Bolton-Est on their behalf.
Download the proxy application
Drop files here or click to upload them.
New construction
Existing construction
Owner
Licenced contractor
Project manager
Other
A plan to scale showing the proposed location for the pond and the distance between the main dwelling, lot lines, any bodies of water or any other relevant items
A side view of the pond showing the natural slope, the fill and the depth of the pond and the height of the dam
Plan showing the waterlevel control system along with a plan of the overflow security outlet
Plan showing the course of the water from the pond to a named brook or lake.You are responsible for getting all servitudes of drainage for your project
If situated in the green zone, provide a plan locating the surface area granted for non-agricultural use (Surface area of acquired rights if the house was built before June 1980 or surface area granted by the CPTAQ if authorization request was accepted for the house)
Email
Telephone